All Listings



Lake Leschenaultia Mountain Bike Trails

A new 12km mountain bike trail network is open at Lake Leschenaultia, including 9 trails spanning 540m to 1.9km and ranging in difficulty from basic to intermediate. The trails have been carefully designed to consider dieback mitigation, avoid native fauna habitats and to leave a minimal trail tread footprint.

Railway Run:
Easy, flat trail following the old miniature rail line. Ideal for beginners and children. 700m.

Man vs Machine:
Long, technical climb for those who like a challenge. Intermediate skills required. Has been hand built. 1.5km.

Eastern Line:
Easiest way to get to the top of the Trail Head. Basic skills required. 1.25km

Yeehaa:
Fast, flowy trail. Leads into the Wahoo trail. Intermediate skills required. 540m.

Hula:
Flowy trail. Basic skills required. 1.4km.

Woohoo:
Ramps and flow. Links to Yeehaa and Shakes n' Ladders. Intermediate skills required. 720m.

Shakes n' Ladders:
Rock gardens and a shore style ladder. Intermediate skills required. 1.3km.

Stewies:
Introduction to Cross Country trails. Basic skills required. 1.9km.

Blue Panther:
Old-school XC style. Intermediate skills required. 1.4km



Contact
Lake Leschenaultia
Rosedale Road
CHIDLOW WA 6556
Phone: +61 8 9290 6645
Mobile:
Email: lake@mundaring.wa.gov.au
Website:
Opening Hours
Monday:Check website for gate opening/closing times
Tuesday:Check website for gate opening/closing times
Wednesday:Check website for gate opening/closing times
Thursday:Check website for gate opening/closing times
Friday:Check website for gate opening/closing times
Saturday:Check website for gate opening/closing times
Sunday:Check website for gate opening/closing times
Location